100BPM Electric Frac Blender
SKU: FR114JC
100BPM Electric Frac Blender
- 100BPM Trailer Mounted Proppant Slurry Frac Blender
- Purpose
- To blend & deliver homogenous gel/proppant/chemical mixtures required for oilfield fracturing & stimulation services. Primary power source to be turbine driven electrical.
- Genset, with electric motor drive(s) on all roating equipment applications.
- Trailer Assembly (1)
- Design
- Single drop deck 80,000lb capacity trailer frame, US DOT on-road complaint
- Material
- Grade 50 (A572 or A992) carbon steel beam construction
- Layout
- Primary members on 35" or 41" CL, with appropriate cross-members
- Towing
- 2" kingpin, 3/8" thick bolster plate
- 52" bolster plate (5th Wheel) height
- Breaks/Lights
- Dual pneumatic glad hand connectors, 7-way electrial socket connector
- Wiring/Lines
- Sealed electrical wiring and protected air-lines with rub guards & grommets
- Suspension
- Two (2) 25,000lb, Mono-pivot Air-Ride, 9" ride height with airbags
- Axles
- Two 25,000lb, 71.5" or 77.5" track, with brake hubs and mounts
- Brakes
- 16" x 7" Meritor ABS brake system with dedicated air reservior
- Tires
- Eight 11R22.5 Tires, BF Goodrich or equivalent
- Wheels
- Eight 22.5 x 8.25, 10 Hole, hub piloted aluminum wheels
- Landing Gear
- Holland Mark-V heavy duty landing gear, manual 2 speed, curb-side crank
- Fenders
- Rugged (AL or Steel) over each re/axle group, front & rear
- Mud Flaps
- Heavy duty rubber mud aps in required locations
- Design
- Primary Engine Drive (1)
- Model
- Gas/Fuel Powered Turbine
- Exhaust
- to be specified
- Accesories
- to be specified
- Model
- Engine/Generator Enclosure
- Model
- to be specified, modular build
- Construction
- Steel or aluminum super structure, perforated internal panels over insulation
- Model
- Electric Power/Distribution System (1)
- Equipment Circuits (voltage to be specified) to drive the following rotating/linear
- Two AC Units
- Operations Enclosure
- Power/Breaker Room
- Generator Enclosure (ambient fan)
- (1) Unit Suction C-Pump
- (1) Unit Discharge C-Pump
- (1) Mix Tub Agitator
- (3) Proppant Augers
- (3) Sand Screw Gate Actuators
- (1) Auger Assembly Actuator (raise/lower)
- (4) Process Valve Actuators
- (2) Dry Chemical Fedder(s) Auger(s)
- (8) Liquid Chem Metering Pumps
- Controls Circuits (Voltage to be specified) to power the follwing componets
- All lighting (internal & external)
- (1) Integrated Controls System (Cabin & Panel)
- (2) Mag Flowmeters
- (8) Coriolis Flowmeters
- (1) Densitometer (Customer supplied)
- (1) Tub Level Sensor
- (1) Grease/Lube Distribution System
- Fluid Handling System (1)
- Discharge Pump
- 14x12x22 Mission Magnum XP High Chrome C-Pump or Gardner Denver
- Suction Pump
- 12x12x14.875 Gorman Rupp C-Pump
- Discharge Piping
- (1) 10" Mag Flowmeter
- (1) Densitometer (Customer supplied)
- (1) 3" Prime-up line
- (2) Discharge control valves (actuated)
- Discharge Manifold
- Positioned roadside
- (12) 4" BFV/Fig-207 cap connections, main manifold
- (2) 4" BFV/Fig 206-wing half connections, 5" gel line
- Suction Piping
- (1) 10" Mag Flowmeter
- (1) 10" Tub bypass valve/line (actuated)
- Suction Manifold
- Positioned curbside
- (14) 4" BFV/Fig-206 wing connections, main manifold
- Blending Tub Assembly (1)
- Build
- Circular 66"0D, 48" depth, rolled/stamped head elliptical bottom
- Capacity
- 6-8 BBL nominal fluid capacity during operation
- Agitator
- Multi-vane, multi-level shear paddle assembly, static vortex breakers
- Level Sensing Electronic & optical tub level sensors
- Build
- Discharge Pump
- Auger/Sandscrew Aseembly (1)
- (3) 12" Auger screws with housing tubes, standard 1:1 ptich fighting
- Hopper details
- Common to all augers
- 40" hopper height off ground when lowered
- Backstop to prevent proppant spillage
- Power screw or geared actuation (raise/lower ation)
- Mechanical lock for stowed position
- Automatic lubrication to all bearings
- Dry Chem-add System (1)
- (2) Acrison 101 -5z style feeder(s)
- Stainless steel construction
- 1ft 3" dry hopper capacity
- Direct feed into blending tub
- Liquid Chem-add System (1)
- (3) Waukesha 006U1 Pumps (5 GPM)
- (3) Waukesha 018U1 Pumps (12 GPM)
- (2) Waukesha 030 Pumps (36 GPM)
- (8) Injection stingers into blending tub
- (3) Injection stingers into suction piping
- (4) Injection stinger discharge piping
- (8) Coriolis flowermeters
- Control Cabin Assembly (1)
- Aluminum or thin steel construction, insulated, modular with bulkheads
- All doors & clearances required to be OSHA complaint
- Fully integrated & designed around LIME blender controls & electric-drive components
- Panels & enclosures to be standard LIME designs, stainless and construction sealed
- Climate control system included
- Platform Assembly
- Steel construction
- All ladders, rails, decking, required to be OSHA complaint
- Adjains control cabin with power enclosures & mix tub assembly
- Fire Protection System
- Customer option
- General Design & Assembly
- Fasteners
- GR8 or GR 10.9 required, no exceptions
- Tagging
- Hoses & cables tagged/labelled on all schematics for production
- 1-Megawatt turbine
- Custom design
- Application engineering
- Component fabrication
- Unit Manufacturing
- Subassembly quality assurance testing
- System Assembly
- Lycoming T-53 Remanufactured to zero hours
- Gearboxes
- Fuel management system
- Engine control system
- Governor Control System
- 480 Volt 60Hz Generator
- Complete assembled system quality assurance testing
- Fasteners
- IP Licensing opportunities for the technology contain in this unit are also available
For more information please contact Info@repforcesales.com or call (855)MAKE-OIL now